23/5/2011 Woh Hup

Duration: 10 weeks

1st week 1st day:
0830 - briefing and project allocation - farren court
1012 - check in
1100 - safety induction course
1230 - lunch
1330 - back to work, wear ppe
1400 - inspection on site
- pipe misalignment - suction by pressure, cause leakage
- study drawing - slab level, finishing level, measurement tap (measure from guide line)
- wood block/pipe - provide tunneling space, wiring pipe
1700 - back to office
- cement used estimation - calculate the cement left.
- study drawing
1900 - check out


热岛,热到sunburn。就戴手表那个部位没有被燃烧着。
inspection工作很轻松,如果晴天一整天。
现在回到家的工作是,走googlemap模拟明天的巴士路程。

建筑业,简单啦~