Wednesday, May 25, 2011

1st week 3rd day

Lightning metal guide marking and welding - hot work permit
Pipe connection 6g welder - 3mm gap 30 to 45 degree slanted mouth, weld, polish 3 times
Safety rope - 2200N
Inspection and coordinate with sub-con
Photoshooting - take photo after inspection and documentation

Meeting - slanted design building, challenging
- drawing and design - computer fully taken, available on saturday
- maintain good relationship with sub-con



画画量量,这样就过一天。
今天下雨。

Tuesday, May 24, 2011

1st week 2nd day

Measurement and inspection



sunburn~~

Monday, May 23, 2011

23/5/2011 Woh Hup

Duration: 10 weeks

1st week 1st day:
0830 - briefing and project allocation - farren court
1012 - check in
1100 - safety induction course
1230 - lunch
1330 - back to work, wear ppe
1400 - inspection on site
- pipe misalignment - suction by pressure, cause leakage
- study drawing - slab level, finishing level, measurement tap (measure from guide line)
- wood block/pipe - provide tunneling space, wiring pipe
1700 - back to office
- cement used estimation - calculate the cement left.
- study drawing
1900 - check out


热岛,热到sunburn。就戴手表那个部位没有被燃烧着。
inspection工作很轻松,如果晴天一整天。
现在回到家的工作是,走googlemap模拟明天的巴士路程。

建筑业,简单啦~